Test objectives helps test ___________ developer to define the relevant test cases.
- A) aggregate
- B) case
- C) plan
- D) suite
M. E. Fagan defined __________ in 1976.
- A) Reviews
- B) Inspections
- C) Documentation
- D) Checklists
There are ____________ outputs of test result reporting.
- A) 3
- B) 6
- C) 5
- D) 4
Which of the following are the number of reasons for organizing test cases in a hierarchical manner?
- A) 6
- B) 5
- C) 4
- D) 3
Inspections can find about ______________ of all defects.
- A) 60%
- B) 100%
- C) 20%
- D) 40%
Inspection process is led by a trained ___________.
- A) Moderator
- B) Reviewer
- C) Author
- D) Developer
Which of the following is tester’s motivation?
- A) Prove the software to be efficient
- B) Solve code issues
- C) Find faults
- D) Identify success factors
Mike Fagan of IBM describes a method called __________ which formalised the software review process.
- A) Pair review
- B) Online review
- C) Peer review
- D) Table review
Regression testing usually refers to testing activities during software ___________________ phase.
- A) maintenance
- B) design
- C) requirements specification
- D) quality assurance
There are ___________ steps in Fagan inspections.
- A) 1
- B) 4
- C) 6
- D) 2
What is the correct sequence from informal to formal in verification methods?
- A) Inspection, Peer review, Walkthrough, Informal
- B) Informal, Walkthrough, Peer review, Inspection
- C) Informal, Inspection, Walkthrough, Peer review
- D) Walkthrough, Inspection, Peer review, Informal
Test plan and _____________ are the first and last steps of Test Data Management respectively.
- A) reporting
- B) test run
- C) recording
- D) Test suite
Which of the following activities are done when software is delivered to QA testing companies?
- A) Test closure
- B) Implementation and execution
- C) Planning and control
- D) Analysis and design
While doing Regression Testing, cost of finding changed part should not exceed rerunning _____________ of the test suite.
- A) selected parts
- B) identified parts
- C) randomly taken chunks
- D) whole
What are the steps involved in Fagan Inspections?
- A) Planning, Overview, Preparation, Inspection, Rework, Follow-up
- B) Overview, Planning, Preparation, Inspection, Rework, Follow-up
- C) Planning, Overview, Inspection, Preparation, Follow-up, Rework
- D) Planning, Overview, Inspection, Preparation, Rework, Follow-up
In mutation testing, mutation score is represented as ___________.
- A) Mutation Score = 100 * E / (N - D)
- B) Mutation Score = 100 * E / (N + D)
- C) Mutation Score = 100 * D / (N + E)
- D) Mutation Score = 100 * D / (N - E)
Evaluating exit criteria and reporting is set of criteria for each test level against which we will measure if ____________testing is done.
- A) complete
- B) enough
- C) perfect
- D) ideal
What is associated with the Product Risk?
- A) Test object
- B) Non-availability of test environment
- C) Negative consequences
- D) Control of test item
Which of the following is the size of team in Fagan inspections for verification?
- A) 1
- B) 4
- C) 2
- D) 6
In fault seeding, confidence C is calculated by ___________.
- A) C = S/(N + S - 1)
- B) C = S/(S - N + 1)
- C) C = S/(S + N + 1)
- D) C = S/(N - S + 1)