MCQ Bank
_________ phase involves converting design specifications into executable programs.
- A) Testing
- B) Configuration
- C) Development
- D) Prototyping
Characteristics of object are called ________
- A) Attributes
- B) Methods
- C) Status
- D) Instances
In flow chart diagram circle represents:
- A) Process
- B) Connector
- C) Diamond
- D) Decision
An association between entities is called __________
- A) Data
- B) Flowchart
- C) Relationship
- D) Attribute
The study of business problem domain used to recommend improvements and specify the business Requirements for the solution is called:
- A) Risk Analysis
- B) Risk Management
- C) System Analysis
- D) System Design
In Flowchart, Arrow is also called __________
- A) Process
- B) Flow line
- C) Dotted line
- D) Link line
________ highlights the system infrastructure and flow of system processes.
- A) Testing manual
- B) Procedural manual
- C) User manual
- D) Technical manual
Which of the following lifecycle models deals with the aspects of risk analysis and is a combination of iterative approach and classic waterfall model?
- A) Waterfall Model
- B) Incremental Model
- C) Linear Sequential Model
- D) Spiral Model
Which of the following are knowledge workers who facilitate the development of information systems and computer applications by bridging the communications gap that exists between non-technical system users, and developers?
- A) Software Engineers
- B) Chief Executives
- C) System Analysts
- D) System Designers
In Flowchart, one segment is connected with another segment using __________________ symbol.
- A) Process box
- B) Connector
- C) Input/Output box
- D) Decision box
In drawing a proper flowchart, all necessary steps that are a part of process should be listed out in ________________ order.
- A) Random
- B) Illogical
- C) Logical
- D) Physical
In Incremental Model approach, __________ is the core product which usually addresses the basic requirements of the system.
- A) Final increment
- B) Last increment
- C) First increment
- D) Second increment
Which of the following allows manufacturers to rapidly and inexpensively test the parts of the design which are most likely to have problems?
- A) Physical Model
- B) Carbon copy
- C) Prototype
- D) Trial version
Prior to the final release into production use, _________phase identifies errors and deficiencies in the system.
- A) Implementation
- B) Review
- C) QA
- D) Testing
In ERD, each attribute has a __________ i.e. defined parameters or the range in which value of the attribute may fall.
- A) Entity (Object)
- B) Flow (sequence)
- C) Relationship (association)
- D) Value Set (domain)
Apart from the value to cost ratio, modules are also selected on the basis of ______ requirements and needs.
- A) designer
- B) customer
- C) system analyst
- D) programmer
Object orientation helps in increasing abstraction level to build _____
- A) New software
- B) Reusable software
- C) Fixed software
- D) Installed software
Rounded shaped symbol in the flow chart is called ____________
- A) Process
- B) Arrow
- C) Decision
- D) Connector
In _________ model, the system is designed, implemented and tested in increments until the product is finished.
- A) Spiral
- B) Iterative
- C) Waterfall
- D) Incremental
Disadvantage of Object Orientation is_________
- A) Abstraction
- B) Complexity
- C) Encapsulation
- D) Inheritance