MCQ Bank
What would be the total cost of inventory if a firm holds 200 units of a product ‘A’,where the carrying cost is Rs. 2 per unit?
- A) Rs. 400
- B) Rs. 100
- C) Rs. 202
- D) Rs. 198
If the “holding cost” decreases, the EOQ will
- A) Remain the same
- B) Increase
- C) Decrease
- D) Change in an irregular pattern
An effective JIT effort should result in increased
- A) Queue time
- B) Quality
- C) Costs
- D) Delay time
Which of the following takes information from the Master Production Schedule to evaluate its feasibility?
- A) Material requirements plan
- B) Aggregate plan
- C) Capacity requirements plan
- D) Rough-cut capacity plan
The ultimate goal of rough-cut capacity planning is:
- A) Achieving efficiency in the processes
- B) Determining feasibility of a cost volume analysis
- C) Approximating inventory requirements
- D) Determining feasibility of a master schedule
Which of the following refers to the cost associated with the order of inventory and its receipt?
- A) Stock out cost
- B) Holding cost
- C) Ordering cost
- D) Shortage cost
Which of the following mathematical expressions can be used to compute total annual cost?
- A) (Q/2) H + (D/Q) S
- B) (Q/2) H - (D/Q) S
- C) (Q/2)S + (D/Q) H
- D) (Q/H) 2 + (D/Q) S
The main advantage of holding the inventory mainly in the manufacturing organizations is:
- A) Improved quality
- B) Material handling reduced
- C) Greater availability
- D) Reduced obsolescence
Identify the time span covered by aggregate planning.
- A) 2-12 months
- B) 2-10 months
- C) 3-7 months
- D) 4-8 months
Refer to the percentage of items in group A of ABC classification system for inventory management
- A) 50%
- B) 10%
- C) 30%
- D) 70%
The foundation of the JIT philosophy lies in:
- A) Re-engineering for breakthrough
- B) Waste reduction
- C) Push production
- D) Variability increase
Capacity requirement planning is the process of determining capacity requirements for
- A) Suppliers
- B) Short-range
- C) Long-range
- D) Customers
Which of the following depicts the overall production rate and size of the workforce required to meet the demand?
- A) Master requirements plan
- B) Master production schedule
- C) Aggregate plan
- D) Capacity requirements plan
Which of the following costs is born by the firm when demand exceeds the supply?
- A) Ordering cost
- B) Holding cost
- C) Stock out cost
- D) Shortage cost
Adjustment of due dates, cancellation of orders and changes in order quantities comes in ___________ of MRP process.
- A) Output
- B) Inventory records
- C) Master production schedule
- D) Bills of material
Lot sizing determines the ____ and ____ of order quantity
- A) Timing, date
- B) Size, price
- C) Timing, size
- D) Date, size
The basic inputs of capacity planning process are:
- A) All of the given
- B) The current shop load & job times
- C) Routing information
- D) Planned order releases for MRP
Which one of the following is an example of a long range plan?
- A) Machine loading
- B) Work schedule
- C) Backorders
- D) Facilities layout
Which of the following formulae can be used to determine number of orders per year?
- A) Q/D
- B) D+Q
- C) D/Q
- D) D-Q
Which of the following is an example of an output of aggregate planning?
- A) Demand forecast
- B) Projected inventory
- C) Overtime cost
- D) Facilities layout