Which of the following is a schedule that specifies the timing and size of production quantities for product in the product families?
- A) Master production scheduling
- B) Aggregate plan
- C) None of the above
- D) Inventory management scheduling
Which of the following is NOT considered while calculating the safety stock level?
- A) Holding cost
- B) Demand variation
- C) Order level
- D) Stock-out cost
MRP system that offers feedback to the capacity plan, master production schedule, and production plans is known as
- A) Bills of materials
- B) Closed-loop MRP
- C) Load report
- D) Lot sizing
Record of quantities of ingredients, components, and materials that is required to produce a product is called
- A) Purchase order
- B) Load reports
- C) Bill of materials
- D) Master schedule
Demand options are focused on which of the following?
- A) Backorders
- B) Matching demand period by period
- C) Subcontracting
- D) Hiring / layoff options
Report that demonstrates the resource requirements of a manufacturing unit for all presently allocated work as well as all planned and expected orders is a
- A) ERP
- B) Closed loop report
- C) Load report
- D) MRP II report
Cycle time for the economic run size is a function of which of the following?
- A) Run time and usage rate
- B) Run time and production rate
- C) Run size and production rate
- D) Run size and usage rate
Which of the following is a computerized info system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.
- A) Material Requirements Planning
- B) Master Production Schedule
- C) Inventory Management Schedule
- D) Material Replenishment Planning
Which of the following refers to the costs incurred to get the equipment ready for the next job?
- A) Ordering cost
- B) Holding cost
- C) Setup cost
- D) Shortage cost
To meet JIT objectives, the process relies on ________between different points in the process.
- A) JIT planning
- B) Signals or kanban
- C) Continuous improvement
- D) Variability increase
Under which of the following, the lot size order covers the gross requirements of a single week?
- A) Economic order quantity model
- B) Part period model
- C) Lot for lot ordering
- D) Fixed period ordering
Planning is much easier and flexible in which of the following?
- A) Production
- B) Research and development
- C) Manufacturing
- D) Services
Which of the following denotes EOQ?
- A) Economic Output Quantity
- B) Equal Order Quantity
- C) Economic Order Quantity
- D) Equal Output Quantity
“Minimize resources needed for Design and Manufacturing” This statement can be categorized among the goals of:
- A) Employee motivation
- B) Re engineering
- C) JIT system
- D) Strategic Manufacturing
Lot sizing technique that produces exactly what was required to meet the plan is
- A) Bills of materials
- B) Lot for lot
- C) EOQ
- D) Part period balancing
Which of the following is the cost of holding inventory for some specific time?
- A) Shrinkage cost
- B) Ordering cost
- C) Carrying cost
- D) Inventory cost
Which one of the following is an example of a short range plan?
- A) Facilities layout
- B) Back order
- C) Product design
- D) Machine loading
Which of the following time fences in a Master Production Schedule (MPS) allows many variations in products with multiple changes?
- A) Moderately firm time fence
- B) Fixed time fence
- C) Flexible time fence
- D) Frozen time fence
JIT is a philosophy of continuous improvement that puts emphasis on prevention rather than:
- A) All of the given
- B) Correction
- C) Employee motivation
- D) Manufacturing
Which of the following shows the quality and timing of specific end items for a scheduled horizon?
- A) Aggregate plan
- B) Simulation model
- C) Critical path model
- D) Master schedule