MCQ Bank
The project scope of work is an iterative process that is generally done by the project team with the use of a ______________, allowing the team to capture and then decompose all of the work of the project.
- A) Advanced COCOMO Model
- B) COCOMO Model
- C) Delphi Technique
- D) Work Breakdown Structure (WBS)
The Delphi technique is a _____________estimation technique.
- A) AI-based
- B) Computer-based
- C) Human-based
- D) Robotic-based
The Source Line of Code (SLOC) technique is ____________ .
- A) Language-Dependent
- B) Technique-Dependent
- C) Platform-Dependent
- D) Functional-Dependent
Estimation of following Critical factors are essential EXCEPT ________ .
- A) Risk
- B) Time
- C) Effort
- D) Cost
To aid planning, scheduling, and monitoring a project, you can use tool(s)________
- A) PERT
- B) All of the given
- C) CPM
- D) Timeline charts
All of the following are the High level WBS structure tasks in Documentation tasks except:
- A) Ordering procedure
- B) Deliverable development documentation
- C) Development documentation
- D) Non-deliverable development documentation
CPM stands for __________.
- A) Cyclic Path Method
- B) Cyclic Process Method
- C) Critical Path Method
- D) Cross process Model
_____________ will assemble larger work packages that can be appropriately managed and controlled.
- A) Shopping projects
- B) Larger projects
- C) Tiny projects
- D) Smaller projects
As project development progresses tasks in the WBS list should be _________________.
- A) Added
- B) Removed
- C) Modified
- D) Added, Modified and Removed
A formal WBS may serve no useful purpose on a very small project, but it can become valuable if project size or complexity ________________.
- A) Start to evaporate
- B) Start to vanish
- C) Start to increase
- D) Start to decrease
Design decomposition of a software project is a division of the system into
- A) High level Components
- B) Low level Modules
- C) High level Components and Low level Modules
- D) Operational components
A change in the arrangement of tasks can occur on the basis of ... theories of
WBS.
- A) Two
- B) Four
- C) Single
- D) Three
If the tasks are not organized efficiently, it becomes difficult to schedule and allocate _________________to the tasks.
- A) Budget
- B) Time
- C) People
- D) Resources
_________ define what kinds of competencies are required from what kinds of individuals or groups and in what time frames.
- A) Staffing requirements
- B) Constraints
- C) Project Interfaces
- D) Organizaion Planning
_______________is also not a mandatory management task in high level management WBS tasks.
- A) Higher management interface and coordination
- B) Quality assurance and control
- C) Customer interface
- D) Configuration management and control
Who will decide that what degree employment of various WBS implementation will benefit the efficient management of the project?
- A) Intelligent manager
- B) Efficient manager
- C) Project manager
- D) Purchase manager
Describe where the work must be performed. Specify the location of hardware and software and where the people must perform the work is called __________
- A) Scope of work
- B) Location of Work
- C) Deliverables Schedule
- D) Period of Performance
In Work breakdown structure (WBS) the work packages may be further decomposed to ________________.
- A) Areas
- B) Sub-projects
- C) Work packages
- D) Project activities
__________ is based on soft skills and relies more on human factors, such as collecting information during group discussions
- A) Function Point (FP)
- B) Source lines of Code (SLOC)
- C) Delphi technique
- D) Constructive Cost Model (COCOMO)
All of the following are the High level WBS structure tasks in Training / Procurement tasks except:
- A) Inventory control
- B) Vendor selection
- C) Ordering procedure
- D) Quality assurance