Which of the following is the basic difference between good project manager and poor project manager?
- A) Project Coordination
- B) Project planning
- C) Project Termination
- D) Project execution
Contract Work Breakdown Structure's (CWBS) elements, should correlate with which of the following?
- A) Reporting requirements
- B) Project work
- C) Non-recurring costs
- D) Work statement tasks
Scope creep can be a result of:
- A) Weak project manager or executive sponsor
- B) None of the above
- C) Both a and b
- D) Poor change control
Refining the estimating criteria is ________________ of scheduling.
- A) Primary objective
- B) Constraint
- C) Objective
- D) Secondary objective
Scope verification includes
- A) Create scope components, scope divide work
- B) Get approval from all stakeholders
- C) Manage scope change requests
- D) None of the above
A Program is usually subdivided into all of the following EXCEPT:
- A) Projects
- B) Milestones
- C) Major Systems
- D) Sub Systems
If the total slack time available for the project begins to increase from one reporting period to the next that may indicate that
- A) More highly skilled labor is required
- B) Both a and b
- C) Work is taking lesser time than anticipated
- D) None of the above
Which of the following will be the duration of a project, if the execution phase is one year?
- A) Two years
- B) Four years
- C) Three years
- D) Five years
Work Breakdown Structure (WBS) subdivides the total effort into:
- A) Discrete and logical levels
- B) Logical elements
- C) Discrete elements
- D) Discrete and logical sub elements
Which of the following types of managers is the true technical expert?
- A) Project manager
- B) Program manager
- C) Assistant project manager
- D) Line manager
Project Manager must assure that Contract Work Breakdown Structure (CWBS) covers:
- A) Level of effort
- B) Level of effort
- C) Measurable effort
- D) All of the given options
Master production schedule reconciles which of the following?
- A) Communication needs
- B) Manufacturing needs
- C) Financial needs
- D) Production needs
General guidelines for project managers are established by:
- A) Middle Management
- B) Lower Management
- C) Top Management
- D) Project Office
Scope of a project is the …………… total of all of a project’s products and their requirements
or features
- A) Product
- B) Sum
- C) None of the above
- D) Sum and product
On non critical path activities, slack time must have which of the following(s) value
- A) None zero
- B) Both a and b can happen
- C) Zero
- D) None of the above
For completing schedule of large programs, input is required from which of the following?
- A) Program manager
- B) Functional management
- C) Project manager
- D) Operational management
Who among the follolwing is responsible to provide technical directions to any problem?
- A) Assistant project manager
- B) Line manager
- C) Project manager
- D) Program manager
Which of the following is the major requirement of program office?
- A) Preparation of statement of work
- B) Identification of major events
- C) Scheduling of activities
- D) Structuring work breakdown structure
Which of the following document provides the project manager with formal authorization to proceed with the project?
- A) Project Scope
- B) None of the above
- C) Project Charter
- D) Project Proposal
Summary schedules are developed for which of the following?
- A) Planners and lower level control
- B) Doers and planners
- C) Management and planners
- D) Doers and management