All of the following verify the correctness of the decomposition in WBS except:
- A) Can each item be appropriately scheduled and budgeted?
- B) Are the low-level items both necessary and sufficient for completion of the decomposed item?
- C) Is each item clearly and completely defined?
- D) Can each item be individually delivered?
Typically, a Program WBS consists of the upper ____________________ levels.
- A) Four
- B) One
- C) Two
- D) Three
___________________is not a mandatory management task in high level management WBS tasks.
- A) Risk analysis and risk management
- B) Personnel management
- C) Budget analysis and administration
- D) Scheduling
An industry standard rule of thumb is to make work packages that can be completed in timeframes of ________ weeks.
- A) One
- B) Four
- C) Two
- D) Three
In Work breakdown structure (WBS) a project may be divided into _______________.
- A) Work packages
- B) Project activities
- C) Areas
- D) Subprojects
All of the following are the High level WBS structure tasks in software development tasks except:
- A) Prototype specification
- B) Requirements analysis
- C) Prototype development
- D) Top level design
All of the following are the High level WBS structure tasks in management tasks except:
- A) Budget administration
- B) Quality assurance
- C) Personnel management
- D) Software enhancement
Functional decomposition of a software project is a division of the system into
- A) High level components
- B) Low level modules and high level components
- C) Operational components
- D) Low level modules
Decomposition of the system into smaller components
needs to be done ... in the planning cycle.
- A) Middle
- B) Middle and Late stage
- C) Late stage
- D) Early
Estimation of all the factors are esential EXCPET ______ .
- A) Cost
- B) Effort
- C) Quality
- D) Risk
COCOMO stands for _____________________.
- A) Cost Consecutive Model
- B) Consecutive Cost Model
- C) Constructive Cost Model
- D) Cost Constructive Model
The decomposition of a software project is one of
the first tasks of...
- A) Software Engineer
- B) Software Analyst
- C) Software tester
- D) Software project manager
Staffing management plan can be_____________
- A) formal
- B) All of the above
- C) highly detailed
- D) informal
__________is measured by the degree of uncertainty in the quantitative estimates established for resources, cost, and schedule.
- A) Time
- B) Access
- C) Size
- D) Risk
In __________ the planner develops estimates of the information domain.
- A) Standard component sizing
- B) All of given
- C) Change sizing
- D) Function point sizing
The COCOMO technique has ______________levels of implementation.
- A) Four
- B) One
- C) Two
- D) Three
__________ is the most expensive element of virtually all computer-based systems.
- A) Cost
- B) Customer
- C) Hardware
- D) Software
____________ is another important factor that can affect the accuracy and efficacy of estimates.
- A) Project Cost
- B) Project Size
- C) project Risk
- D) Project Time
In Work breakdown structure (WBS) subprojects are subdivided into smaller, more manageable work components (_________________) at the lowest level.
- A) Areas
- B) Sub-projects
- C) Project activities
- D) Work packages
Estimating the effort in the basic COCOMO technique involves following three steps except:
- A) Determining the effort constants based on the type of the project
- B) Substituting values for lines of code and effort constant in a formula
- C) Estimating the total delivered lines of code
- D) Calculating the effort adjustment factor