MCQ Bank
__________ is one of the most important management activity and is an ongoing effort throughout the life of the project.
- A) Planning
- B) Organizing
- C) Analysis
- D) Leading
The Data Item Descriptions define the formal documentation standards for all required documents generated during the development of software according to standard
- A) 2167
- B) 2267
- C) 1267
- D) 2276
The DIDs (Data Item Description) includes a section called __________
- A) Associated Documentation
- B) Effective Resolution
- C) Formal Documentation
- D) Preparation Instruction
___________ is not an evaluation method used to validate performance.
- A) Transaction Logs
- B) Setup schedule for reviews
- C) Business Development
- D) Testing for adherence to spec
Computer software deteriorates due to change is often referred to as ______.
- A) Software Configuration
- B) Software Manufacturing
- C) Software Planning
- D) Software Reengineering
A ______________is defined as a collection of related tasks with specific milestones.
- A) Practice
- B) Project
- C) Process
- D) Product
A ________ is a series of action bringing about a result
- A) Schedule
- B) Project plan
- C) Flow chart
- D) Process
All project activities __________.
- A) Should be within the boundary of defined goal
- B) Should not be within the defined boundaries of goal
- C) Should not comply with any goal
- D) Out of boundaries of the defined goal
CSOM stands for________
- A) Computer software operator's manual
- B) Computer system obvious manual
- C) Computer system operator's manual
- D) Computer system offered manual
Which of the following is NOT the goal of SMARTER.
- A) Measurable
- B) Resources
- C) Realistic
- D) Specific
The _______ of scope planning are the scope statement and scope management plan, with the supporting detail.
- A) processes
- B) Logs
- C) Inputs
- D) Outputs
Computer software deteriorates due to change is often referred to as ______.
- A) Software Reengineering
- B) Software Configuration
- C) Software Planning
- D) Software Manufacturing
SDP Stands for ________________.
- A) Software Design Plan
- B) Software Defining Phase
- C) Software Development Plan
- D) Software Demanding Plan
Reviews conducted at each of this phase/s_______
- A) Analysis
- B) Coding
- C) Design
- D) All of given
________________is anything that reduces the probability of potential consequences of project risk events.
- A) Scope plan
- B) Preventive action
- C) Corrective action
- D) Configuration plan
The DIDs (Data Item Description) includes a section called __________
- A) Preparation Instruction
- B) Effective Resolution
- C) Associated Documentation
- D) Formal Documentation
People are managed through a(n) _______ .
- A) Nature
- B) Organizational culture
- C) Culture
- D) Organizational structure
A ___________ contract is a commitment by the developer to provide an agreed product or service for an agreed fee, within an agreed schedule.
- A) Variable Price
- B) Cost-Plus
- C) Fixed price
- D) Schedule
We use _____________ when there is a conflict in client requirements.
- A) Waterfall model
- B) Spiral model
- C) Prototyping model
- D) RAD model
________ ensures that the standards laid down for a project are followed.
- A) Quality control
- B) Process control
- C) Quality assurance
- D) Product evaluation