____________ states that 80% of the defects can be traced to 20% of its causes.
- A) D.Steeter Principle
- B) Kraul Principle
- C) Fred Brooks Principle
- D) Pareto Principle
_________ is the probability that a program is operating according to requirements at a given point in time.
- A) Security
- B) Reliability
- C) Usability
- D) Availability
Poka Yoke is a Japanese term and it means:
- A) Status Reporting
- B) Risk Navigation
- C) Mistake Proofing
- D) Resource Planning
Following are effective guidelines for Review EXCEPT
- A) We need to review the product not the producer
- B) Be sensitive to personal egos
- C) Tone should be high and strict
- D) Errors should be pointed out gently
Change Control process addresses the important question of:
- A) Who is the project manager of the project
- B) Who will finally approve the deployment of project
- C) who has the responsibility for approving and ranking changes.
- D) Who will test the Software
_________ serve as the starting point for further development and by helping us to control change without seriously impeding justifiable change.
- A) Mistake-Proofing
- B) Baseline
- C) Change Control
- D) Full Version
Version Control discusses about:
- A) How the resources will be assigned to tasks in work breakdown structure (WBS).
- B) How the test cases will be executed before deploying each release.
- C) How does an organization control changes before and after installation released to a customer.
- D) How many features will be included in a software.
The two objectives of a _________ are to identify problem areas within the work product and a checklist of action items.
- A) Informal Technical Reviews
- B) Formal Technical Reviews
- C) Review Issue List
- D) Testing
Quality cost may be divided into costs associated with:
- A) Prevention, appraisal and failure
- B) Customers, developers and maintenance
- C) Builds, releases and products
- D) Bugs, errors and Reports
In a review the ___________ should be pointed out gently and the tone should be loose and constructive.
- A) Errors
- B) Outputs
- C) Conditions
- D) Inputs
The equation to find out the Availability of software is:
- A) Availability = (MTTF / MTBF) x 100
- B) Availability = (MTTF + MTBF) x 100
- C) Availability = (MTTF - MTBF) x 100
- D) Availability = (MTTF x MTBF) / 100
SQA is an umbrella activity in which following activities are performed EXCEPT
- A) Inspection
- B) Project Planning
- C) Testing
- D) Review
___________ involves rework, repair, and failure mode analysis of the product.
- A) Prevention Cost
- B) Appraisal Cost
- C) Internal Failure Cost
- D) External Failure Cost
A model where Some errors are passed through to the next step undetected such errors are said to have been ___________ .
- A) Multiplexed
- B) Reduced
- C) Neutralised
- D) Amplified
_________ help the development team in improving the defect removal efficiency and hence results in a high-quality software product.
- A) Design
- B) Planning
- C) Reviews
- D) Architecture
The basic idea behind Software configuration management is:
- A) To properly manage status reporting
- B) To manage and control the change
- C) To provide portability
- D) To efficiently allocate the resources
A quantitative quality measuring technique that helps to uncover root cause for an error and then work on to fix what was traced is called __________.
- A) Statistical Software Quality Assurance
- B) Non-Statistical Software Quality Assurance
- C) Walkthroughs
- D) Formal Technical Review
_________ are sometimes also known as walkthroughs or Inspections.
- A) Formal Technical reviews
- B) Testing
- C) Informal Technical reviews
- D) Debugging
_________ define a set of development criteria for engineering a high quality software product.
- A) Specified Standards
- B) Non-Functional Requirements
- C) Project Managers
- D) Functional Requirements
It is noted that a/an __________ review can be worse than no review at all.
- A) Controlled
- B) Normal
- C) Intermediate
- D) Uncontrolled