MCQ Bank
Maintaining quality is the responsibility of ______ in the organization.
- A) Everyone
- B) Top Management
- C) Quality Control Department
- D) Operations Department
Which one of the following is TRUE about work sampling?
- A) It providing standard times for micro motions such as reach, move and release
- B) It describes individual human motions that are used in a job task
- C) It involves determining the amount of time a worker spends on various activities
- D) It involves determining the length of time it will take to undertake a particular task
If the final inspector at an automobile paint shop discovers that the paint on the car has a poor finish, the car may have to be completely rescinded and repainted. This would result in ________ incurred.
- A) External failure cost
- B) Appraisal cost
- C) Prevention cost
- D) Internal failure cost
Which of the following is an internal failure cost?
- A) Liability cost
- B) Interest cost
- C) Loss of future business cost
- D) Rework cost
_____ costs are incurred if the item is routed to some previous operations to correct the defect or if the service must be performed again?
- A) Process redesigning costs
- B) Scrapped work costs
- C) Appraisal costs
- D) Rework costs
In _________ sampling, one random sample is drawn from each lot
- A) Double
- B) Multiple
- C) None of the above
- D) Single
___________ is a mean of translating customer requirements into the appropriate technical requirements for each stage of service development
- A) Robustness
- B) Quality function development
- C) Poka-Yoke
- D) Quality function deployment
Ali got his mobile repaired from UNITED MOBILES which was situated very near to his home. Which dimension of service quality is referred in this example?
- A) Responsiveness
- B) Reliability
- C) Assurance
- D) Convenience
Assembly lines relate most closely to a:
- A) Functional layout
- B) Process layout
- C) Product layout
- D) Departmental layout
Which one of the following layout type is associated with a supermarket?
- A) Product layout
- B) Fixed Position layout
- C) Process layout
- D) Cellular layout
In statistical process control, some tools are used primarily to detect production of defective products / services or process changes. What those tools are known as?
- A) Regression charts
- B) Control charts
- C) Pareto charts
- D) Histograms
Reliability and safety of service is ensured through which of the following?
- A) Quality in design
- B) Quality in equipment
- C) Quality in system
- D) Quality in training
The disadvantages of specialization to management include all of the following EXCEPT:
- A) More difficult to teach the job
- B) Minimum responsibility
- C) More absenteeism
- D) More turnover
Increase in inspection results in the increase of which cost?
- A) Appraisal costs
- B) Rework costs
- C) Inspection costs
- D) Prevention costs
Which one of the following is not a Dimension of Quality
- A) Special Features
- B) Size & Shape
- C) Perceived Quality
- D) Durability
Which one of the following is the first step in line balancing?
- A) Determine the required cycle time.
- B) Specify the sequential relationship among tasks.
- C) Determine the minimum number of workstations.
- D) Determine the desired output
Which stage comes after the “compare” stage of control process?
- A) Correct
- B) Monitor
- C) Evaluate
- D) Measure
Averages of accepted and rejected batches in operating curve is known as__________.
- A) Average lot tolerance percent defective
- B) Average acceptance quality level
- C) Average outgoing quality limit
- D) Average outgoing quality
Who emphasized quality in terms of inspection and gauging?
- A) F.W. Taylor
- B) G.S. Radford
- C) W.E. Demig
- D) W. Shewhart
An operations manager of milling plant is facing a decline in the number of scrapped units at a milling machine. This change in process can be detected by which of the following?
- A) None of the above
- B) Six sigma
- C) Statistical process control
- D) Inspection process