MCQ Bank
A release can be defined as a distribution of the __________________ of software product.
- A) Final version
- B) Last version
- C) Second version
- D) First version
______________________is a structured and organized activity in order to confirm that the built software product fully address the documented and agreed upon requirements.
- A) Requirement verification
- B) Testing
- C) Coding
- D) Quality assurance
Functional requirements are captured using_________.
- A) Use cases
- B) Entity relation diagram
- C) Classes
- D) Sequence diagram
___________________ is the process of addressing root causes of defects to prevent their future occurrence.
- A) Defect removal
- B) Defect detection
- C) Defect containment
- D) Defect prevention
To attain _______we must avoid ambiguity, a requirement must express the entire need and state all conditions and constraints under which it applies.
- A) Cohesiveness
- B) Completeness
- C) Correctness
- D) Feasibility
Defect Prevention also dig deep into the source of _______ and course of actions to be taken
- A) Application
- B) Error
- C) code
- D) Solution
-------- bugs have very high cost plus it can hit reputation also.
- A) In house
- B) Pre-release
- C) Testing Phase
- D) Production level
_________________ is a process where QA team executes the product to find out defects or bugs and to ensure that the product gives the required output.
- A) Inspections
- B) Testing
- C) Walkthroughs
- D) Analysis
“All stakeholders must be communicating openly to correctly analyze the expectations/needs of client and converting them into software requirement” this attribute is called____________.
- A) Feasible
- B) Correct
- C) Complete
- D) Coherent
Release includes -----------, environment variables and backlog.
- A) SRS Documents
- B) Release notes
- C) DFD diagrams
- D) Set of features
The focus of default containment is to reduce or eliminate ________ defects.
- A) Continuous
- B) Escaping
- C) Future
- D) Past
------------ are usually part of release notes.
- A) Syntax Errors
- B) Semantic Errors
- C) Post release Defects
- D) Pre-release Defects
According to ______ attribute of software requirement engineering, a requirement must be necessary for the software system and should be adding some business value.
- A) Correct
- B) Coherent
- C) Necessary
- D) Complete
The -------- serve as basis as connector between different phases of SDLC.
- A) Reviews
- B) Test cases
- C) CSS templates
- D) Use cases
Product development is achieved via _________________ when a working product is delivered to the customer.
- A) Patches
- B) Release
- C) Version
- D) Update
Pre-release defects are defined as ____________ which have potential to create problem to users and customers.
- A) Dormant defects
- B) Unfamiliar defects
- C) Secret defects
- D) Unknown defects
Dormant defects may occur on ______priority areas.
- A) Medium
- B) High
- C) Low
- D) Critical
Being _______, requirements should be linked to source in Requirement Specifications.
- A) Necessary
- B) Verifiable
- C) Coherent
- D) Traceable
Post-release defects have _______ cost of fixing as compared to other defects.
- A) Medium
- B) higher
- C) Lower
- D) None of the given
________is the process of addressing root causes of defects to prevent their future occurrence.
- A) Default Containment
- B) Testing
- C) Default Detection
- D) Defect Prevention