Staffing management plan can be_____________
- A) formal
- B) All of the above
- C) highly detailed
- D) informal
__________is measured by the degree of uncertainty in the quantitative estimates established for resources, cost, and schedule.
- A) Time
- B) Access
- C) Size
- D) Risk
In __________ the planner develops estimates of the information domain.
- A) Standard component sizing
- B) All of given
- C) Change sizing
- D) Function point sizing
The COCOMO technique has ______________levels of implementation.
- A) Four
- B) One
- C) Two
- D) Three
__________ is the most expensive element of virtually all computer-based systems.
- A) Cost
- B) Customer
- C) Hardware
- D) Software
____________ is another important factor that can affect the accuracy and efficacy of estimates.
- A) Project Cost
- B) Project Size
- C) project Risk
- D) Project Time
In Work breakdown structure (WBS) subprojects are subdivided into smaller, more manageable work components (_________________) at the lowest level.
- A) Areas
- B) Sub-projects
- C) Project activities
- D) Work packages
Estimating the effort in the basic COCOMO technique involves following three steps except:
- A) Determining the effort constants based on the type of the project
- B) Substituting values for lines of code and effort constant in a formula
- C) Estimating the total delivered lines of code
- D) Calculating the effort adjustment factor
The project scope of work is an iterative process that is generally done by the project team with the use of a ______________, allowing the team to capture and then decompose all of the work of the project.
- A) Advanced COCOMO Model
- B) COCOMO Model
- C) Delphi Technique
- D) Work Breakdown Structure (WBS)
The Delphi technique is a _____________estimation technique.
- A) AI-based
- B) Computer-based
- C) Human-based
- D) Robotic-based
The Source Line of Code (SLOC) technique is ____________ .
- A) Language-Dependent
- B) Technique-Dependent
- C) Platform-Dependent
- D) Functional-Dependent
Estimation of following Critical factors are essential EXCEPT ________ .
- A) Risk
- B) Time
- C) Effort
- D) Cost
To aid planning, scheduling, and monitoring a project, you can use tool(s)________
- A) PERT
- B) All of the given
- C) CPM
- D) Timeline charts
All of the following are the High level WBS structure tasks in Documentation tasks except:
- A) Ordering procedure
- B) Deliverable development documentation
- C) Development documentation
- D) Non-deliverable development documentation
CPM stands for __________.
- A) Cyclic Path Method
- B) Cyclic Process Method
- C) Critical Path Method
- D) Cross process Model
_____________ will assemble larger work packages that can be appropriately managed and controlled.
- A) Shopping projects
- B) Larger projects
- C) Tiny projects
- D) Smaller projects
As project development progresses tasks in the WBS list should be _________________.
- A) Added
- B) Removed
- C) Modified
- D) Added, Modified and Removed
A formal WBS may serve no useful purpose on a very small project, but it can become valuable if project size or complexity ________________.
- A) Start to evaporate
- B) Start to vanish
- C) Start to increase
- D) Start to decrease
Design decomposition of a software project is a division of the system into
- A) High level Components
- B) Low level Modules
- C) High level Components and Low level Modules
- D) Operational components
A change in the arrangement of tasks can occur on the basis of ... theories of
WBS.
- A) Two
- B) Four
- C) Single
- D) Three