SDP Stands for ________________.
- A) Software Design Plan
- B) Software Defining Phase
- C) Software Development Plan
- D) Software Demanding Plan
Reviews conducted at each of this phase/s_______
- A) Analysis
- B) Coding
- C) Design
- D) All of given
________________is anything that reduces the probability of potential consequences of project risk events.
- A) Scope plan
- B) Preventive action
- C) Corrective action
- D) Configuration plan
The DIDs (Data Item Description) includes a section called __________
- A) Preparation Instruction
- B) Effective Resolution
- C) Associated Documentation
- D) Formal Documentation
People are managed through a(n) _______ .
- A) Nature
- B) Organizational culture
- C) Culture
- D) Organizational structure
A ___________ contract is a commitment by the developer to provide an agreed product or service for an agreed fee, within an agreed schedule.
- A) Variable Price
- B) Cost-Plus
- C) Fixed price
- D) Schedule
We use _____________ when there is a conflict in client requirements.
- A) Waterfall model
- B) Spiral model
- C) Prototyping model
- D) RAD model
________ ensures that the standards laid down for a project are followed.
- A) Quality control
- B) Process control
- C) Quality assurance
- D) Product evaluation
All of the following verify the correctness of the decomposition in WBS except:
- A) Can each item be appropriately scheduled and budgeted?
- B) Are the low-level items both necessary and sufficient for completion of the decomposed item?
- C) Is each item clearly and completely defined?
- D) Can each item be individually delivered?
Typically, a Program WBS consists of the upper ____________________ levels.
- A) Four
- B) One
- C) Two
- D) Three
___________________is not a mandatory management task in high level management WBS tasks.
- A) Risk analysis and risk management
- B) Personnel management
- C) Budget analysis and administration
- D) Scheduling
An industry standard rule of thumb is to make work packages that can be completed in timeframes of ________ weeks.
- A) One
- B) Four
- C) Two
- D) Three
In Work breakdown structure (WBS) a project may be divided into _______________.
- A) Work packages
- B) Project activities
- C) Areas
- D) Subprojects
All of the following are the High level WBS structure tasks in software development tasks except:
- A) Prototype specification
- B) Requirements analysis
- C) Prototype development
- D) Top level design
All of the following are the High level WBS structure tasks in management tasks except:
- A) Budget administration
- B) Quality assurance
- C) Personnel management
- D) Software enhancement
Functional decomposition of a software project is a division of the system into
- A) High level components
- B) Low level modules and high level components
- C) Operational components
- D) Low level modules
Decomposition of the system into smaller components
needs to be done ... in the planning cycle.
- A) Middle
- B) Middle and Late stage
- C) Late stage
- D) Early
Estimation of all the factors are esential EXCPET ______ .
- A) Cost
- B) Effort
- C) Quality
- D) Risk
COCOMO stands for _____________________.
- A) Cost Consecutive Model
- B) Consecutive Cost Model
- C) Constructive Cost Model
- D) Cost Constructive Model
The decomposition of a software project is one of
the first tasks of...
- A) Software Engineer
- B) Software Analyst
- C) Software tester
- D) Software project manager