MCQ Bank
Putting all logical activities together is called ___________.
- A) Developer activities
- B) Designer activities
- C) Process activities
- D) Scope planning
When you build a product or system, it's important to go through a series of predictable steps – a road map that helps you create a timely, high-quality result, The road map that you follow is called a __________
- A) Software schedule
- B) Software process
- C) Framework
- D) Software design
SDP Stands for ________________.
- A) Software Defining Phase
- B) Software Development Plan
- C) Software Demanding Plan
- D) Software Design Plan
There should not be any ambiguity and any grey area in complete wording regarding the scope.
- A) Similarity planning
- B) Activity sequence
- C) Scope definition
- D) Activity definition
If the size of a project is extensive and the client prefers all the features of the proposed
project at the first delivery, you can select the ___________ Model.
- A) RAD
- B) Incremental
- C) Prototyping
- D) WaterFall
There cannot be a sudden crossover from one phase to the next in __________.
- A) RAD model
- B) Spiral model
- C) Prototyping model
- D) Waterfall model
People are managed through a(n) _______ .
- A) Organizational culture
- B) Nature
- C) Organizational structure
- D) Culture
An output from the quality planning process is
- A) Quality management plan
- B) Acceptance decision
- C) Process adjustment
- D) Quality improvements
__________ is one of the most important management activity and is an ongoing effort throughout the life of the project.
- A) Planning
- B) Organizing
- C) Analysis
- D) Leading
The Data Item Descriptions define the formal documentation standards for all required documents generated during the development of software according to standard
- A) 2167
- B) 2267
- C) 1267
- D) 2276
The DIDs (Data Item Description) includes a section called __________
- A) Associated Documentation
- B) Effective Resolution
- C) Formal Documentation
- D) Preparation Instruction
___________ is not an evaluation method used to validate performance.
- A) Transaction Logs
- B) Setup schedule for reviews
- C) Business Development
- D) Testing for adherence to spec
Computer software deteriorates due to change is often referred to as ______.
- A) Software Configuration
- B) Software Manufacturing
- C) Software Planning
- D) Software Reengineering
A ______________is defined as a collection of related tasks with specific milestones.
- A) Practice
- B) Project
- C) Process
- D) Product
A ________ is a series of action bringing about a result
- A) Schedule
- B) Project plan
- C) Flow chart
- D) Process
All project activities __________.
- A) Should be within the boundary of defined goal
- B) Should not be within the defined boundaries of goal
- C) Should not comply with any goal
- D) Out of boundaries of the defined goal
CSOM stands for________
- A) Computer software operator's manual
- B) Computer system obvious manual
- C) Computer system operator's manual
- D) Computer system offered manual
Which of the following is NOT the goal of SMARTER.
- A) Measurable
- B) Resources
- C) Realistic
- D) Specific
The _______ of scope planning are the scope statement and scope management plan, with the supporting detail.
- A) processes
- B) Logs
- C) Inputs
- D) Outputs
Computer software deteriorates due to change is often referred to as ______.
- A) Software Reengineering
- B) Software Configuration
- C) Software Planning
- D) Software Manufacturing