MCQ Bank
Prior to the final release into production use, _________phase identifies errors and deficiencies in the system.
- A) Implementation
- B) Review
- C) QA
- D) Testing
MIS stands for:
- A) Management Information System
- B)
- C)
- D)
In ERD, each attribute has a __________ i.e. defined parameters or the range in which value of the attribute may fall.
- A) Entity (Object)
- B) Flow (sequence)
- C) Relationship (association)
- D) Value Set (domain)
Public companies are the example of __________.
- A) Medium sized organization
- B)
- C)
- D)
Apart from the value to cost ratio, modules are also selected on the basis of ______ requirements and needs.
- A) designer
- B) customer
- C) system analyst
- D) programmer
The comparison of actual output along with expected output has been done by ________________.
- A) Control mechanism
- B)
- C)
- D)
Object orientation helps in increasing abstraction level to build _____
- A) New software
- B) Reusable software
- C) Fixed software
- D) Installed software
Data represents ___________.
- A) raw facts
- B)
- C)
- D)
Rounded shaped symbol in the flow chart is called ____________
- A) Process
- B) Arrow
- C) Decision
- D) Connector
Generation of _______ is the objective of every information system.
- A) Relevant information
- B)
- C)
- D)
In _________ model, the system is designed, implemented and tested in increments until the product is finished.
- A) Spiral
- B) Iterative
- C) Waterfall
- D) Incremental
____________ have collection of predefined Procedures related to each other in a sequenced logical manner in order to collectively achieve the desired results?
- A) Systems
- B)
- C)
- D)
Disadvantage of Object Orientation is_________
- A) Abstraction
- B) Complexity
- C) Encapsulation
- D) Inheritance
Systems use closely related and logically sequenced _______ to achieve the desired results.
- A) Procedures
- B)
- C)
- D)
We get a final increment after the _______ development phase in Incremental Model.
- A) integrate increment
- B) developing increment
- C) validate increment
- D) validate system
Which of the following is NOT an example of Office Automation System?
- A) Data Mining
- B)
- C)
- D)
Which of the following is used to test the function of the new design before starting production of a product?
- A) Mathematical Model
- B) Beta version
- C) Trial version
- D) Prototype
School library is the example of ______________.
- A) closed system
- B)
- C)
- D)
Qualification is an example of _____________ attribute.
- A) Multi-valued
- B) Derived
- C) Composite
- D) Simple
___________ is a record of an enterprise's past transactional and operational information.
- A) Data warehouse
- B)
- C)
- D)