The cost of a particular plan for a given period can be computed by using which one of the following expressions?
- A) Output cost - hire(layoff cost) + inventory cost + backorder cost
- B) Output cost + hire(layoff cost) + inventory cost – backorder cost
- C) Output cost + hire(layoff cost) + inventory cost + backorder cost
- D) Output cost + hire(layoff cost) - inventory cost + backorder cost
What would be the total backorder cost if 100 units of a product ‘A’ are ordered back where the back order cost is Rs. 2 per unit?
- A) Rs. 98
- B) Rs. 200
- C) Rs. 50
- D) Rs. 102
Identify the mathematical expression to determine the number of workers in a given period.
Where a = Number of workers at the end of previous period, b = Number of new workers at the start of the current period, c = Number of laid-off workers at the start of the current period
- A) a + b - c
- B) a - b + c
- C) a - b - c
- D) a + b + c
Reduced space requirements, reduced inventory investment, and reduced lead times, are the benefits of which of the followings?
- A) Continuous improvement
- B) Re engineering
- C) Kanban
- D) Lean system
The key benefit of just in time inventory system lies in the
- A) Exposure of problems in the production/distribution system
- B) Increased overall inventory value
- C) Increased production rates
- D) Use of a pull rather than a push inventory system
In the manufacturing organizations the prerequisites for the implementation of JIT system are:
- A) Executive Commitment
- B) All of the given
- C) Strategic Manufacturing Plan
- D) A Reason for Changing, and Commitment to Action
What would be the total cost of inventory if a firm holds 1000 units of a product ‘A’, where the carrying cost is Rs. 5 per unit?
- A) Rs. 995
- B) Rs. 5000
- C) Rs. 200
- D) Rs. 1050
All of the following are determinants of reorder point EXCEPT:
- A) Stock out risk
- B) Rate of demand
- C) Lead time
- D) Setup cost
The concept of breaking up of the order and running part of it ahead of schedule is called
- A) Load report
- B) Overlapping
- C) Lot splitting
- D) Operations splitting
Which of the following shows the quantity and timing of specific end items for a scheduled horizon?
- A) Critical path model
- B) Master schedule
- C) Aggregate plan
- D) Simulation model
What would be the total cost of inventory if a firm holds 200 units of a product ‘A’,where the carrying cost is Rs. 2 per unit?
- A) Rs. 400
- B) Rs. 100
- C) Rs. 202
- D) Rs. 198
If the “holding cost” decreases, the EOQ will
- A) Remain the same
- B) Increase
- C) Decrease
- D) Change in an irregular pattern
An effective JIT effort should result in increased
- A) Queue time
- B) Quality
- C) Costs
- D) Delay time
Which of the following takes information from the Master Production Schedule to evaluate its feasibility?
- A) Material requirements plan
- B) Aggregate plan
- C) Capacity requirements plan
- D) Rough-cut capacity plan
The ultimate goal of rough-cut capacity planning is:
- A) Achieving efficiency in the processes
- B) Determining feasibility of a cost volume analysis
- C) Approximating inventory requirements
- D) Determining feasibility of a master schedule
Which of the following refers to the cost associated with the order of inventory and its receipt?
- A) Stock out cost
- B) Holding cost
- C) Ordering cost
- D) Shortage cost
Which of the following mathematical expressions can be used to compute total annual cost?
- A) (Q/2) H + (D/Q) S
- B) (Q/2) H - (D/Q) S
- C) (Q/2)S + (D/Q) H
- D) (Q/H) 2 + (D/Q) S
The main advantage of holding the inventory mainly in the manufacturing organizations is:
- A) Improved quality
- B) Material handling reduced
- C) Greater availability
- D) Reduced obsolescence
Identify the time span covered by aggregate planning.
- A) 2-12 months
- B) 2-10 months
- C) 3-7 months
- D) 4-8 months
Refer to the percentage of items in group A of ABC classification system for inventory management
- A) 50%
- B) 10%
- C) 30%
- D) 70%