Which one of the following is the focus of predetermined motion time system?
- A) Determining the length of time it will take to undertake a particular task
- B) Individual human motions that are used in a job task
- C) Determining the amount of time a worker spends on various activities
- D) Providing standard times for micro motions such as reach, move and release
An operations manager of milling plant is facing a decline in the number of scrapped units at a milling machine. This change in process can be detected by which of the following?
- A) Six sigma
- B) Inspection process
- C) None of the above
- D) Statistical process control
Generally an Operations Manager should NOT inspect the process for defects_________.
- A) Before manufacturing high volume products
- B) Before purchasing raw material
- C) Before the supply of finished goods
- D) Before a costly operation
___________ is a mean of translating customer requirements into the appropriate technical requirements for each stage of service development
- A) Quality function development
- B) Robustness
- C) Poka-Yoke
- D) Quality function deployment
Which one of the following statements is NOT correct about cycle time?
- A) It represents daily operating time divided by desired production
- B) It determines the time often items take to roll off in assembly line
- C) It is the time required to complete a product from start to finish
- D) It is the maximum allowable time at each work station
Who introduced the use of statistical control charts to Japanese manufacturers?
- A) Philip Crosby
- B) Joseph Juran
- C) Edwards Deming
- D) Kaoru Ishikawa
Among the following which one is a JIT scheduling tactic?
- A) Produce in large batches
- B) Move goods through the plant in larger batches but produce them in small batches
- C) Level schedules
- D) Use the same purchase order form with each order that is placed
Partially completed units within a production system are known as:
- A) Economic order quantity
- B) Work-in-process
- C) Safety stock
- D) Units-in-order
Refer to the percentage of items in group 'C' of ABC classification system for inventory management.
- A) 30%
- B) 20%
- C) 10%
- D) 70%
Which of the following refers to the costs of carrying an item in inventory for a specific period of time?
- A) Shortage cost
- B) Ordering cost
- C) Stock out cost
- D) Holding cost
Which of the following is a schedule that specifies the timing and size of production quantities for product in the product families?
- A) Master production scheduling
- B) Aggregate plan
- C) None of the above
- D) Inventory management scheduling
Which of the following is NOT considered while calculating the safety stock level?
- A) Holding cost
- B) Demand variation
- C) Order level
- D) Stock-out cost
MRP system that offers feedback to the capacity plan, master production schedule, and production plans is known as
- A) Bills of materials
- B) Closed-loop MRP
- C) Load report
- D) Lot sizing
Record of quantities of ingredients, components, and materials that is required to produce a product is called
- A) Purchase order
- B) Load reports
- C) Bill of materials
- D) Master schedule
Demand options are focused on which of the following?
- A) Backorders
- B) Matching demand period by period
- C) Subcontracting
- D) Hiring / layoff options
Report that demonstrates the resource requirements of a manufacturing unit for all presently allocated work as well as all planned and expected orders is a
- A) ERP
- B) Closed loop report
- C) Load report
- D) MRP II report
Cycle time for the economic run size is a function of which of the following?
- A) Run time and usage rate
- B) Run time and production rate
- C) Run size and production rate
- D) Run size and usage rate
Which of the following is a computerized info system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.
- A) Material Requirements Planning
- B) Master Production Schedule
- C) Inventory Management Schedule
- D) Material Replenishment Planning
Which of the following refers to the costs incurred to get the equipment ready for the next job?
- A) Ordering cost
- B) Holding cost
- C) Setup cost
- D) Shortage cost
To meet JIT objectives, the process relies on ________between different points in the process.
- A) JIT planning
- B) Signals or kanban
- C) Continuous improvement
- D) Variability increase