MCQ Bank
Which of the following is a common feature of inventory models?
- A) Profit maximization
- B) Cost minimization
- C) Minimizing setup times
- D) Lead time minimization
Which one of the following refers to inventory turnover?
- A) A ratio of work in process to the average inventory investment
- B) A ratio of cost of carrying cost to the average inventory investment
- C) A ratio of cost of goods sold to the average inventory investment
- D) A ratio of cost of assets to the average inventory investment
Organizations following JIT philosophy require encouraging ________ concept between organization’s purchasing department, supplier, management and labor.
- A) Flexibility
- B) Re engineering
- C) Partnership
- D) Good housekeeping
Aggregate plans are updated
- A) Twice a year
- B) Periodically
- C) At project end
- D) Once a year
If a firm subcontracts 300 units of a product ‘A’, with the subcontracting cost of Rs. 3 per unit. What would be the total subcontracting cost?
- A) Rs. 297
- B) Rs. 900
- C) Rs. 100
- D) Rs. 303
Identify the set of factors that affect the choice of a strategy for aggregate planning.
- A) Cost and corporate profits
- B) Cost and location analysis
- C) Cost and training of employees
- D) Cost and capacity constraints
Which of the following is Not an assumption of economic order quantity model?
- A) No constraints on size of each lot
- B) No quantity discounts
- C) Demand is always variable
- D) No uncertainty in lead time or supply
There is no inventory buildup when:
- A) Usage and production rates are equal
- B) Orders are frequently placed
- C) Production rate exceeds usage rate
- D) Usage rate exceeds production rate
MPS stands for which of the following?
- A) Master Planning Schedule
- B) Material Production Schedule
- C) Material Planning Schedule
- D) Master Production Schedule
A rule of lot size that maintains the same order quantity each time an order is issued is known as
- A) Economic order quantity model
- B) Lot for lot ordering
- C) Part period model
- D) Fixed period ordering
Capacity options are usually of __________ range in nature
- A) Long
- B) Intermediate
- C) Periodical
- D) Short
Which of the following is not the distinctiveness of just in time suppliers?
- A) Short term contract agreements
- B) The purchaser actually helping the supplier to meet the quality requirements
- C) Scheduling inbound freight
- D) Minimal release paperwork
If a firm subcontracts 600 units of a product ‘A’, with the subcontracting cost of Rs. 6 per unit. What would be the total subcontracting cost?
- A) Rs. 3600
- B) Rs. 594
- C) Rs. 606
- D) Rs. 100
Which of the following mathematical expressions can be employed to compute backorder cost?
- A) Backorder cost per unit × number of backordered units
- B) Backorder cost per unit + number of backordered units
- C) Backorder cost per unit - number of backordered units
- D) Backorder cost per unit /number of backordered units
What does EOQ stand for in inventory management?
- A) Essential Order Quantity
- B) Economic Order Quantity
- C) Efficient Order Quantity
- D) Economic Organization Quantity
In employment stability, we have the following options except __________.
- A) Hold employment constant by maintaining the trained workforce
- B) Hold employment constant and labor is treated as a fixed cost
- C) All the options given
- D) Follow demand exactly
Which of the following inventory management strategies helps to reduce inventory levels and minimize inventory costs?
- A) Just-in-time (JIT)
- B) ABC Analysis
- C) LIFO
- D) FIFO
As per the Hawthorn studies, which of the following statements best describes about worker productivity?
- A) It increases when worker receive attention and feel valued.
- B) It is solely determined by physical working conditions.
- C) It is unaffected by social factors.
- D) It is higher in isolated work environments.
In which of the following method, the time standard for a job can be set in a laboratory away from the actual production operation.
- A) None of the options given
- B) Historical experience
- C) Time studies
- D) Predetermined time standards
While using time studies methods in labor standards and work measurement, we use ____________ and ______________ to calculate the standard time of a job.
- A) None of the options given
- B) Total Normal time and Allowance factor
- C) Allowance factor and TMU
- D) Total Normal time and TMU