MCQ Bank
Which of the following is one of the prime determinants of choosing a plan?
- A) Technology
- B) Time
- C) Personnel
- D) Resources
In the “Check” stage, team analyzes the data collected during the ____ stage to find out how closely the results correspond to the specifications of ____ stage.
- A) Plan, Do
- B) Do, Plan
- C) Do, Check
- D) Plan, Check
The technical aspect of Six Sigma includes all of the following Except:
- A) Improving process performance
- B) Reduction in variations
- C) Top management commitment
- D) Use of statistical methods
Which of the following refers to changing the job role of one worker with another?
- A) Job rotation
- B) Job design
- C) Job enrichment
- D) Job enlargement
Which one of the following refers to the length of time needed to complete a job?
- A) Work measurement
- B) Work sampling methods
- C) Job design
- D) Methods analysis
Technology has impacted the work place by:
- A) Unifying the workforce to a common skill level
- B) Increasing the amount required to be spent on training
- C) Adding to the existing geographical barriers for recruiting
- D) Increasing the cost of telecommuting
Which one of the following is a disadvantage of a process layout?
- A) Minimizing material handling costs
- B) Use of individual incentive system
- C) Equipment utilization rate is high
- D) A variety of processing requirements
Generally most of the values in control charts fall within which range of standard deviation?
- A) +/- 1
- B) +/- 3
- C) +/- 4
- D) +/- 5
Six Sigma is primarily centered towards all of the following except:
- A) Cost cutting
- B) Time saving
- C) Quality improvement
- D) Continuous improvement
In six sigma process, ________ stage comes after the “Analyze” stage
- A) Monitor
- B) Improve
- C) Control
- D) Choose
All are six sigma teams except:
- A) Master "black belts"
- B) Master "green belts"
- C) "Green belts"
- D) "Black belts"
Generally an Operations Manager should NOT inspect the process for defects_________.
- A) Before the supply of finished goods
- B) Before a costly operation
- C) Before purchasing raw material
- D) Before manufacturing high volume products
Which one of the following is a type of layout where equipment, machinery and people are moved as required?
- A) Product layout
- B) Process layout
- C) Hybrid layout
- D) Fixed position layout
Which of the following contributes in customer’s perception of Expected Service?
- A) After service guarantee
- B) Service features
- C) Past experience
- D) Reliability of service
Maintaining quality is the responsibility of ______ in the organization.
- A) Everyone
- B) Top Management
- C) Quality Control Department
- D) Operations Department
Which one of the following is TRUE about work sampling?
- A) It providing standard times for micro motions such as reach, move and release
- B) It describes individual human motions that are used in a job task
- C) It involves determining the amount of time a worker spends on various activities
- D) It involves determining the length of time it will take to undertake a particular task
If the final inspector at an automobile paint shop discovers that the paint on the car has a poor finish, the car may have to be completely rescinded and repainted. This would result in ________ incurred.
- A) External failure cost
- B) Appraisal cost
- C) Prevention cost
- D) Internal failure cost
Which of the following is an internal failure cost?
- A) Liability cost
- B) Interest cost
- C) Loss of future business cost
- D) Rework cost
_____ costs are incurred if the item is routed to some previous operations to correct the defect or if the service must be performed again?
- A) Process redesigning costs
- B) Scrapped work costs
- C) Appraisal costs
- D) Rework costs
In _________ sampling, one random sample is drawn from each lot
- A) Double
- B) Multiple
- C) None of the above
- D) Single