MCQ Bank
______________ is the management section of quality management.
- A) Total quality control
- B) Process control charts
- C) Quality control
- D) Quality assurance
______________ provides the future credibility.
- A) Backup support cost
- B) Cost package
- C) Pricing techniques
- D) Salary structure
How many tools are used for quality improvement?
- A) Productivity and efficiency
- B) Quality and effectiveness
- C) Efficiency and effectiveness
- D) Quality and productivity
_____________ ensures that project scope, cost, and time functions are fully integrated.
- A) Quality control
- B) Quality assurance
- C) Quality management
- D) Inspection
_________ compares the actual results with the quality standards.
- A) Process control charts
- B) Total quality control
- C) Quality control system
- D) Cost of quality
Which of the following is an example of a primary customer?
- A) Logistic department
- B) Lab test report receiver
- C) Bank’s head office receiver
- D) Transporter
Productivity, is an output input agreement on consideration of which of the following?
- A) Effectiveness and time
- B) Efficiency and time
- C) Quality and time
- D) Competitiveness and time
Statistical process control, is a practical application of which of the following?
- A) Qualitative methods
- B) Qualitative facts
- C) Quantitative methods
- D) Quantitative facts
Trend Analysis, is often performed with the help of which of the following?
- A) Cause and effect diagram
- B) Pareto chart
- C) Scatter diagram
- D) Run chart
_____________ makes the basis of a successful program management.
- A) Time management
- B) Salary structure
- C) Pricing out of activities
- D) Cost package
In which of the four major categories of quality costs, would the costs associated with scrap and re-work fall?
- A) Prevention costs
- B) Internal failure costs
- C) Appraisal costs
- D) External failure costs
___________ is the lowest level of quality development.
- A) Total Quality Management
- B) Quality Assurance
- C) Inspection
- D) Quality Management
How is the standard of living determined?
- A) Productivity of a nation's economy
- B) Effectiveness
- C) Competitiveness
- D) Efficiency
How many levels are involved in development of quality?
- A) Six levels
- B) Five levels
- C) Eight levels
- D) Seven levels
The emphasis is changed from product to process at ______________ stage.
- A) Inspection
- B) Quality management
- C) Quality assurance
- D) Quality control
Which of the following is viewed as a vertical teamwork between managerial and non-managerial personnel?
- A) Performance
- B) Empowerment
- C) Continuous improvement
- D) Planning
Fitness to cost can be obtained by:
- A) Developing quality management
- B) Determining the customer’s needs
- C) Building of customer needed products
- D) Obtaining high quality and low cost products
Which of the following is NOT a major pricing input requirement?
- A) Material cost
- B) Backup cost
- C) Salary structure
- D) Labor hours
___________includes quality audits.
- A) Total quality control
- B) Quality control
- C) Quality management
- D) Quality assurance
In project pricing, projection of expenses is made based on which of the following(s)
- A) Changes in public laws
- B) Manpower requirements and turnover rates
- C) All of the given options
- D) Historical direct/indirect labor ratios