Project Manager must assure that Contract Work Breakdown Structure (CWBS) covers:
- A) Level of effort
- B) Level of effort
- C) Measurable effort
- D) All of the given options
Master production schedule reconciles which of the following?
- A) Communication needs
- B) Manufacturing needs
- C) Financial needs
- D) Production needs
General guidelines for project managers are established by:
- A) Middle Management
- B) Lower Management
- C) Top Management
- D) Project Office
Scope of a project is the …………… total of all of a project’s products and their requirements
or features
- A) Product
- B) Sum
- C) None of the above
- D) Sum and product
On non critical path activities, slack time must have which of the following(s) value
- A) None zero
- B) Both a and b can happen
- C) Zero
- D) None of the above
For completing schedule of large programs, input is required from which of the following?
- A) Program manager
- B) Functional management
- C) Project manager
- D) Operational management
Who among the follolwing is responsible to provide technical directions to any problem?
- A) Assistant project manager
- B) Line manager
- C) Project manager
- D) Program manager
Which of the following is the major requirement of program office?
- A) Preparation of statement of work
- B) Identification of major events
- C) Scheduling of activities
- D) Structuring work breakdown structure
Which of the following document provides the project manager with formal authorization to proceed with the project?
- A) Project Scope
- B) None of the above
- C) Project Charter
- D) Project Proposal
Summary schedules are developed for which of the following?
- A) Planners and lower level control
- B) Doers and planners
- C) Management and planners
- D) Doers and management
A program plan measures which of the following?
- A) Performance
- B) Manpower
- C) Program requirements
- D) Facility requirements
If the total slack time available for the project begins to decrease from one reporting period to the next that may indicate that
- A) Work is taking longer than anticipated
- B) Both a and b
- C) None of the above
- D) More highly skilled labor is required
Detailed schedules are developed for which of the following?
- A) Doers and lower level control
- B) Doers and management
- C) Management and planners
- D) Planners and lower level control
Scope defines the size of the project. Scope include(s) which of the following(s)?
- A) All of the above
- B) Departments
- C) Deliverables
- D) Geographic locations
Scope change control includes
- A) None of the above
- B) Get approval from all stakeholders
- C) Get approval from all stakeholders
- D) Manage scope change requests
Which of the following methods breaks work down into system & major sub systems?
- A) Logic flow diagram
- B) Life cycle Method
- C) Flow Method
- D) Organization Method
The time differential between the scheduled completion date and required date to meet critical path is said to be
- A) Critical time
- B) None of the above
- C) Slack time
- D) Both a and b
Which of the following is a Master production schedule?
- A) Production plan
- B) Manufacturing plan
- C) Sales plan
- D) Financial plan
Scope management is mainly concerned with which of the following(s)
- A) None f the above
- B) Controlling the scope of a project
- C) Both a and b
- D) Defining the scope of a project
Contract Work Breakdown Structure (CWBS) included in Contract should not extend lower than _____________ level.
- A) Third Level
- B) Second Level
- C) Fourth Level
- D) First Level